Summary

Taynuilt signal box was taken out of use early in 1986 when simplified signalling arrangements were installed for the later introduction of Radio Electronic Token Block. Electric Token Block working was retained in the meantime (No Signalman Key Token to Oban). The arrangements were altered early in 1987, when right-hand running was introduced through the crossing loop. In 1988, RETB was commissioned and Taynuilt became a token exchange point. For a period of just four weeks, Taynuilt marked the temporary limit of RETB operation.


16 February 1986

Loop converted to RETB specifications.



Taynuilt (1986)
Taynuilt (1986)

23 February 1986

Shunt cards replaced by a "shunt token".


11 January 1987

Loop directions reversed.



Taynuilt (1987)
Taynuilt (1987)

27 March 1988

RETB commissioned between Crianlarich and Taynuilt.



Taynuilt (1988)
Taynuilt (1988)

24 April 1988

RETB commissioned between Taynuilt and Oban.



Taynuilt (1988)
Taynuilt (1988)

7 July 2002

Alteration to points set indicators.


29 October 2003

TPWS commissioned. Additional stop boards provided.



Taynuilt (2003)
Taynuilt (2003)

Week commencing 27 March 2006

Additional emergency token exchange point telephone provided.


14 August 2012

Points set indicators replaced.