Home Page > Instructions > Auchindarroch Siding

Auchindarroch Siding


These instructions appeared in the Appendix to the Working Time Table, dated 1st May, 1915.

AUCHINDARROCH SIDING-Between Duror and Kentallen.-The Dwarf Frame for this Siding is controlled by the Tablet for Duror and Kentallen Section. The Siding may be worked, when required, by Up or Down Trains. The Guard must inform the Station Master at Kentallen or Duror when he is to work the Siding.