Home Page > Instructions > Trains using Apparatus

Trains using Apparatus


These instructions appeared in the Appendix to the Working Time Table, dated 1st May, 1915.

TRAINS USING APPARATUS.-At Crianlarich Junction (East), on account of the position of the Down Line Apparatus, Engine Drivers of all Down Trains or Engines must deliver the Tablet by hand, except in the case of the 12.2 a.m. Train from Stirling, which will use the Apparatus.
At Killin Junction (West), on account of the position of the Apparatus, Engine Drivers must deliver the Tablet by hand, except in the case of the 6.45 p.m. Train from Oban, which will use the Apparatus.